Prefabricated transmission tower foundation
Conventional tower after excavation of the foundation soil Scaffolding steel pipe installed and the files after installing the dice against the foundation construction and dismantling the dice again after that break up the installation and dismanling of Scaffolding for the time and is costly, has problems that can cause accidents.
¦Features¦
Strict quality control is high-quality pre-made products.
Scaffolding for curing the concrete foundation, installation and dismantling of formwork saves time by eliminating the need for work and construction that is easy to effect.
Scaffolding and formwork installation and dismentling to accidents that occur while.
¦Construction Method¦
Separated by assembling pre-manufactured blocks do not block the excavation of the ground and buried in the basement of a block, then install it on the block, and repeated until the desired depth in the same way, and install it.
Prefabricated transmission tower foundatio...
Description
Product Inquiry
Purchase Product Catalog
Payment & Shipping Conditions:
- Payment: We accept payment through Paypal Only.
- Shipping: We will ship the catalog once the payment is received. And you will be receiving the catalog with in 10 -14 busines days. Shipping might be delayed in due to international shipping conditions which is depends on the countries receiveing. In case hard copy of catalog is not available then we will ship the soft copy.
- Refund: We can refund the order before shipping process was initiated. Incase Catalog not available, we will make sure to refund the order.
- Note: This is a Catalog Produt.
Share Prefabricated transmission tower foundatio... in Social Media