Sewage Treatment Plant

Sewage Treatment Plant

Sewage Treatment Plant Made in Korea

Description

Product DescriptionSewage Treatment Since Hyosung Ebara Engineering Co., Ltd. (“HEEC”) carried out the first biological treatment facility for Gumi sewage treatment plant in 1987, HEEC has retained a variety of experiences in relation to various capacity and treatment process. ? Potable Drinking Water/Deep seawater Plant HEEC is recognized as having the good techniques in field of drinking water, deep seawater and beverage Plant. The ‘Samdasu’, potable drinking water, occupies the biggest market share in South Korea. In addition, HEEC has carried out the Gangwon deep seawater plant project by turn-key basis. ? Waste Incineration Fluidized-Bed Incinerator, as main incineration technology, is one of the most advanced systems enabling automatic operation, prevention of odor, and treatment and removal of hazardous materials in the methods of waste treatment. HEEC has carried out many EPC projects in field of Fluidized-bed incinerator including Incheon international Airport incinerator and indonest paper sludge incinerator. In addition, ICFB(Internally Circulating Fluidized-bed Boiler) is also high technology to treat waste and it is operating to the following: Fuel(Waste) is sent to combustion chamber which fluidized sand is circulating, and completely burned. High-temperature sand is sent to the chamber for heat recovery, and then, the sand helps boiler water in tube to heat, and it is returned to the combustion chamber. By circulating like this process, the ICFB maximizes the energy recovery. In addition, the ICFB is high efficiency electric power generation technology which can incinerate a variety of wastes such as refuse tire, refuse wood, RDF, sludge and domestic waste. Product FeatureSewage Technology - Advanced Sewage Treatment : HUB-II Process - Optimized Operating Technology of Advanced Sewage Treatment :AAA Package - Membrane :HP-MBR ? Water Purification Technology - High Efficiency Water Treatment : Ceramic Membrane(Metawater) - Advanced Water Treatment : AOP+GAC, Two-stage Mixed filter ? Process water & Cooling water Treatment - Hyosung Steel Water Treatment : The largest record in field of Steel Mill water treatment facility ? Drinking water Treatment - Potable drinking water : filtration, Membrane, sterilization - Deep sea water : Evaporator, Electro Dialysis, Reverse Osmosis Product Specification / ModelsWaste Treatment Technology(Incinerator) - TIF(Twin-Interchanging Fluidized-bed Incinerator) - ICFB(Internally Circulating Fluidized-bed Boiler) ?Sludge Treatment & Recycling - Sludge Carbonization - Sludge Solidification - Sludge Dry - MBT(Mechanical Biological Treatment) - RDF(Refuse Derived Fuel) - Aerobic Compost - Anaerobic Digestion Other InformationProject : BRH Water Treatment Plant(Water Treatment) Country : Malaysia Capacity : 25,000 m3/day Process : Physical-Chemical Treatment Period : 2007~2009 Project : Sewage Treatment Plant (Sewage Treatment including pumping stations) Country : Qatar Mesaieed Capacity : 6,750 m3/day Process : MLE Period : 2008 ~2010 Project : COSIPA Steel mill WWTP (Wastewater Treatment) Country : Brazil Capacity : 850,000 m3/day Process : Physical- Chemical Treatment Period : 2008~2011 Project : Aspex Kumbong Inc. Plant Country : Indonesia Capacity : 640 ton/day Process : Fluidized Bed Incineration Period : 2005 ~2006 Other overseas projects : Sewage water treatment(Algeria), Solid waste management & treatment project(Vietnam)

Product Inquiry

Your Name:
Your E-Mail:
Telephone Number:
Fax Number:
Your Country & Territory:
Address:
Subject:
Product Quantity Looking for:
Your Message:

Note: Please clealry menction the product/product names, Model, Size & other specifications that will help us to reply you as soon as possible.
Additional Details Required:
  • Minimum Order Quantity
  • Payment Terms
  • More Product Details
  • Availability / Cost
  • Shipping Details
  • Certificates
  • Expected Delivery Lead Time
Confirm Text:    captcha
 

Purchase Product Catalog

Payment & Shipping Conditions:
  • Payment: We accept payment through Paypal Only.
  • Shipping: We will ship the catalog once the payment is received. And you will be receiving the catalog with in 10 -14 busines days. Shipping might be delayed in due to international shipping conditions which is depends on the countries receiveing. In case hard copy of catalog is not available then we will ship the soft copy.
  • Refund: We can refund the order before shipping process was initiated. Incase Catalog not available, we will make sure to refund the order.
  • Note: This is a Catalog Produt.

Products Categories

Products Keywords

Share Sewage Treatment Plant in Social Media