Trans loading facility operated between coal terminal and ship in the coal transfer system.
1) BORNEO INDAH 1
- Order from STX Shipbuilding CO.,LTD.(KOREA)
- Owner :SAMTAN CO.,LTD.(KOREA)
PT KIDECO Jaya Agung (Indonesia) from 2008.4. ~ 2009. 2.
- Coal Loader Facility / New Building
- G.T : 6,410 Ton
- L.B.D :110.0 x 27.5 x 7.0m
2) SEA LIFT NO.1
- Order from PT. JAYA SAMUDERA KARUNIA(JSK)
- From 2006.6. ~ 2006.12.
- Self Propelling Coal Loader Facility
- Full Conversion
- G.T : 1,462 Ton
- L.B.D : 55.8 x 22.0 x 3.8m
3) SEA LIFT NO.2
- Order from PT. JAYA SAMUDERA KARUNIA (JSK)
- From 2007.5. ~ 2007.12.
- Coal Loader Facility
- New Building
- G.T : 3,151 Ton
- L.B.D : 91.5 x 24.4 x 5.5m
4) Coal Loader facility
-Coal Loading Process
5) Terminal Type
Share Floating Loading Facility in Social Media